The Construction Phase Plan your Principal Designer will actually sign off.
Bespoke, site-specific, written for your project — not a template with your logo pasted on the front. Delivered in 5 working days from instruction.
The template problem
Downloaded CPPs fail Principal Designer review for three reasons.
01 · Wrong hazards
A template lists generic construction hazards. Your PD wants the ones on your site — the neighbouring school, the buried services, the party wall, the deliveries down a single-track lane.
02 · Wrong arrangements
Templates don't know your programme, your subcontractors, your welfare set-up, or your emergency plan. The Regs require specifics. Blanks and boilerplate don't count.
03 · Wrong version
Many circulating templates still reference CDM 2007 or cite guidance that's been withdrawn. Reviewers spot it immediately and it undermines everything else in the plan.
What's in your plan
Everything CDM 2015 Appendix 3 asks for — populated with your project.
How it works
From instruction to signed-off plan in five working days.
Send us the pack
Tender pack, programme, site info, F10 reference if you have one. Or book a 15-minute call and we'll pull it out of you.
We draft the plan
Written from scratch to your project. Draft in your inbox within five working days of instruction.
You review, we revise
Mark it up, we amend. Two rounds of revisions included in the fixed fee.
Signed-off, delivered
Final version as editable Word plus signed PDF — ready to hand to your Principal Designer or CDM Advisor.
Common questions
Straight answers before you get in touch.
My CPP has already been rejected. Can you rewrite it?
Yes — often the fastest job we do. Send the rejected plan and the reviewer's comments; we'll quote to rewrite rather than start from scratch.
The project starts next week. Can you meet that?
Sometimes. Call us with the dates before you commit. We won't take work we can't deliver — you'll get a straight answer, not a maybe.
It's a small domestic notifiable job — is £495 really the price?
Yes. Small notifiable projects still need a proper CPP; the fee reflects the size and complexity of the job, not a corporate minimum.
Can you write our RAMS and Pre-Construction Info too?
Yes. Ask for a bundled quote at instruction — it's usually cheaper than commissioning each separately.
Are you insured?
Yes — full Professional Indemnity and Public Liability. Certificates on request.
Send the pack. Get a fixed-fee quote same day.
Fill out the short contact form and we'll come back the same working day with a fixed fee and a delivery date. Or email direct if you'd rather.